365bet体育直播

  • Shanxian Hengsheng Refrigeration Engineering Co., Ltd. is a professional cold storage design and installation company
  • Site Map | XML
    新闻资讯 Position: Home > News > News > News
    What are the requirements for the quality of the floor of the Shandong cold storage installation design?
    Author: Shan County Hengsheng Refrigeration Engineering Co., Ltd. Published: 2019-10-30 23:29:06
    The waterproof floor is leveled. The epoxy floor is padded with raw materials at uneven places, and the locking hooks between the board and the board are clamped, so that the surface of the warehouse is flat and there is no hollow feeling. (Note that if the drainage system is installed outside the north, the drainage pipe needs to be insulated).

    In the design of Shandong cold storage installation, the epoxy floor should be laid first when installing the floor, and then just after installing the floor, choose a beautiful and elegant wooden floor in a conspicuous place, and implement the wooden floor and evaporator drainage system.

    山东冷库安装设计

    对地板质量的相关要求介绍了,大家都清楚了吗? The above is the introduction of the relevant requirements on the quality of the floor of the Shandong cold storage installation design . Is everyone clear?


    relevant information:
    必赢亚洲网投 亚洲版在线体育投注 黄金城棋牌官网下载 真人在线投注平台 e世博游戏注册 千赢国际电子游戏官网体育 亚美娱乐官网登录入口 澳门亚美娱乐网址注册 澳门皇家平台网赌 缅甸皇家赌场网站app